In progress: Plastering works in building C and D, thermal insulation of the building and installation of façade brick on building A, B and D, installation of window system on building B and D. Installation of thermal insulation in the garage has begun. The assembly of balcony railings in buildings A and B has started. The flooring layers of buildings A and B have started to be installed. Electrical, sanitary and ventilation installations are in progress. Freon installation in building A and B was made.
The form has been sent. The Sales Department will contact you as soon as possible.