In progress: Insulation of the building with the assembly of elevation bricks on building C and D, assembly of door system on building A, B, C and D. Assembly of balcony railings in building C. Assembly of gallery railings is in progress. Works on electrical, sanitary and ventilation installations are in progress. Works related to the development of the investment area have started. The garage hall lighting is being installed.