In progress: The assembly of balustrades in the galleries is in progress. Facade works have been completed. Works on the electrical, sanitary and ventilation installations are in progress. Works related to the development of the investment area are in progress. The assembly of the elevator has been completed. The floors of the balconies and the gallery of the mezzanine level were finished. The fence is being assembled. The following connections have been completed and accepted: power, plumbing, MPEC. The construction of the garage resin surface has begun. A garage door has been installed.