In progress: Installation of balcony railings on all buildings has been completed. The balustrades are being installed in the galleries. Insulation of the building is in progress, together with the installation of elevation bricks on building C and D. The assembly of the door system on building A, B, C and D has been completed. Electrical, sanitary and ventilation installations are in progress. Works related to the development of the investment area have commenced. The installation of sanitary, electrical and ventilation systems in the garage has been completed. The assembly of the elevator has started. The floors of the balconies and gallery of the Mezzanine level were finished. The fence is being assembled.
The form has been sent. The Sales Department will contact you as soon as possible.